TEAM Englewood Community Academy
Verified evidence grade of this record
TEAM Englewood opened in the former Englewood High School building under Renaissance 2010; shrank to 76 students (~98% African-American); its students were consolidated with Harper, Hope, and Robeson into the new $85M Englewood STEM High School (6835 S. Normal Blvd.), which opened Sept 3, 2019.
Notes
Merged into canonical KG 2026-10-03 from PLACE-001; source entity IDs: CTL-DR-PLACE-001:PLACE-078; source research type(s): school. Description completed 2026-10-03 from the source research record (claims) during the KG completion pass. Era not present in source research record(s); marked unspecified pending human review.
Sources
- https://www.chalkbeat.org/chicago/2019/1/29/21106695/can-a-new-high-school-heal-years-of-school-closings-in-englewood/
Record CTL-E-0990 · CultureTechLens Knowledge Graph · evidence grade: Verified · CTL research: PLACE-001.
Directory: all entity records · the knowledge graph
From the Archive
The archive in pictures
The people, places, and institutions this work documents. Photographs from the CultureTechLens research record — rights-cleared, credited, and cited like everything else here.



Trust & evidence
Evidence before authority. CultureTechLens publishes its methods, its limits, and its corrections alongside its findings. Claims carry grades — VERIFIED, SUPPORTED, PROVISIONAL, DISPUTED, UNRESOLVED — and unknowns are never reported as zero.
Every claim graded. Every source named. Every correction public — none to date.